Whole-House Renovation Order of Works: Where Flooring Fits

Wood-look plank flooring being installed in a terrace living room over an existing floor — Lantai Living, Klang Valley

A whole-house renovation in a Selangor terrace, semi-D or bungalow involves many trades: hacking, plumbing, wiring, plaster ceiling, carpentry, painting, flooring, stairs and often the porch and garden. Each one is straightforward on its own. The trouble usually comes from the order. A new floor installed too early can be scratched by ladders, splashed with paint or dented by carpentry. Installed too late, it may hold up cabinets or force awkward cuts.

This guide sets out a practical renovation order of works for a landed home, shows where flooring fits, and explains how to protect it until you move in. Every project is different, so treat this as a starting point to discuss with your contractor.

Short answer: In most landed-home renovations, the order is: plan and approvals, hacking and demolition, structural and wet works, M&E rough-in (plumbing, wiring, aircon piping), plaster ceiling, first coat of paint, flooring, carpentry and built-ins, stair finishing, final paint and fittings, then outdoor works and a final clean. Flooring goes in after the dusty and wet trades, then gets protected straight away.

Planning a whole-house renovation?

Send us your area, house type and the rooms you want floored. We’ll suggest where flooring fits in your contractor’s timeline.

A Typical Order of Works

StepWorkWhy it comes here
1Design, quotes and approvalsDecisions on layout and floors affect every trade after
2Hacking and demolitionThe messiest step; must be finished before anything new goes in
3Structural, extension and wet worksKitchen and bathroom waterproofing and tiling, extensions
4M&E rough-inWiring, plumbing and aircon piping in walls, ceilings and floors
5Plaster ceiling and partitionsDusty overhead work, best before finishes
6First coat of paintHeavy painting before the floor goes down
7FlooringInstalled on a clean, prepared base, then protected
8Carpentry and built-insKitchen cabinets, wardrobes, TV feature walls
9StairsTreads and nosings finished to match the floors
10Final paint, lights and fittingsTouch-ups once carpentry is done
11Outdoor worksPorch, decking, artificial grass, gate and fence
12Final clean and handoverProtection removed, snag list checked

Steps 1–5: Getting the Messy Work Done

Plan floors early. Decide which rooms get which flooring at design stage. Floor height matters: tiles, SPC and vinyl all have different thicknesses, and transitions between rooms, doors and stairs need planning. If you plan to keep the old tiles and lay SPC over them, that affects door clearances too. Our guide to laying SPC over existing tiles explains what to check.

Hacking and wet works. Hacking old tiles, walls or kitchens creates a lot of dust and debris. Kitchen and bathroom waterproofing and tiling are wet trades that should finish before the main floor goes in.

M&E and ceilings. Electricians, plumbers and aircon installers often need to run pipes and cables through floors and walls. Plaster ceiling work drops dust everywhere. All of this is better done before the new floor arrives.

Installer tip: Before the floor goes in, walk through the house and check that all floor-level points are fixed: floor traps, socket positions near the floor, aircon drain pipes and any cables crossing the slab. Moving them after the floor is down is much harder.

Step 6–7: Paint, Then Flooring

Most contractors do the first full coat of paint before flooring, because ladders, rollers and drips are hard on a new floor. Final touch-ups happen later, with the floor protected.

Flooring then goes onto a clean, prepared base. For floating floors such as SPC, the installer will check that the base is flat and dry, then lay underlay and planks. Our guide to the installation process explains what usually happens on the day.

Terrace living room with warm honey-tone herringbone plank flooring and dark skirting — Lantai Living, Klang Valley
Warm honey-tone herringbone plank flooring in a terrace living room. Installing the floor after the dusty trades have finished helps it reach handover in good condition.

Step 8: Carpentry and Built-Ins

Here there is a choice to make with your carpenter and flooring installer:

  • Floor first, cabinets on top: common with glued floors and lighter built-ins.
  • Cabinets first, floor fitted around: often preferred with floating floors under heavy kitchen cabinets and full-height wardrobes, so the floor can still move and planks can be replaced.

Either way, agree it before ordering, because it affects quantities, kick-board heights and skirting.

Not sure whether cabinets or flooring should go first?

WhatsApp us your kitchen and wardrobe plans. We’ll explain the options for your floor type.

Step 9: Stairs

Stairs are usually finished after the main floors so the treads and nosings match in colour and height. Plan the stair finish together with the floor at design stage, especially if you want the same wood look upstairs and down.

Step 10–11: Final Touches and Outdoor Works

Final painting, lights and fittings happen with the floor covered. Outdoor works such as porch tiles, decking and artificial grass often come near the end, partly because heavy materials and machinery pass through the porch during the main renovation.

Dark wood-look decking being installed in a covered outdoor area, work in progress — Lantai Living, Klang Valley
Dark wood-look decking being installed in a covered outdoor area. Outdoor works often come near the end, after heavy materials no longer need to pass through.

For outdoor surfaces, see our guides to outdoor decking and artificial grass.

Protecting the New Floor Until You Move In

For room-by-room decisions on living areas, bedrooms, kitchens, stairs and outdoor spaces, see our room-by-room guide for landed homes. To see the options we install, visit our SPC flooring page, or contact us to arrange a site visit.

FAQ

Usually after hacking, wet works, wiring, plumbing, plaster ceiling and the first coat of paint, and before or around carpentry. The exact order depends on your floor type and built-ins.

It depends. With floating floors such as SPC, heavy cabinets are often installed first and the floor fitted around them. Discuss with your installer and carpenter before ordering.

Most contractors do the main painting before flooring and final touch-ups after, with the floor protected.

Usually after the main floors, so treads and nosings can match the floor colour and finished height.

Cover it with protection sheets or boards immediately after installation, tape the edges and keep it covered until the final clean.

Plan Flooring for Your Renovation

Send us these on WhatsApp and we’ll reply with the next steps:

  1. Your area (e.g. Shah Alam, Klang, Puchong, Subang)
  2. House type (terrace, semi-D, bungalow)
  3. Rooms to floor and approx sqft
  4. Current floor (tiles, cement, marble, other)
  5. Your contractor’s rough timeline, if you have one
  6. 2–3 photos of the house

What happens after you WhatsApp us

Reply → site visit → timing → quote

  1. We reply with questions about your renovation.
  2. We arrange a site visit in the Klang Valley to measure and check the base.
  3. We suggest where flooring fits in your order of works.